Customization: | Available |
---|---|
Certification: | CCC, RoHS, ISO, CE |
Hole: | with Hole |
Still deciding? Get samples of US$ 12/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Perforated Cable Tray type cable rack raceway
HDMANN PERFORATED CABLE TRAY SYSTEM
HDMANN perforated cable tray is constructed of precision engineered, high quality, welded steel and is the result of decades of research gained from the installation of 94,000 miles of tray across the globe.
Perforated cable tray is subjected to testing at every stage of the manufacturing process. In actual use, it has performed in a wide variety of office buildings and is widely used for from heavy power cable pathways on oil drilling platforms to data installation above the ceiling. perforated cable tray
Our perforated cable tray is alailable in depths of 25-200 mm, and in a variaty of widths, ranging from 30-1000mm. The standard finish is electroplared zinc after fabrication. A variaty of other finishes available are including hot dipped galvanized after fabrication, pre-galvanized as well as multitude of colors in powder coating. The perforated cable tray is also available in type 304 and 316 stainless steels for extremely corrosive enviroments.perforated cable tray
As for the cable tray fittings, a complement of accessories and brackets used for perforated cable tray installation are also provided. See our catalogue unpon request.
Perforated cable tray standard specification
Perforated cable tray fittings
Perforated cale tray coupler&clamps
Table of perforated cable tray dimension&weight(kg/meter) | |||||||
W*H/Thick | 0.8 | 1 | 1.2 | 1.5 | 2 | 2.5 | |
50*50 | Lid | 0.53 | 0.66 | 0.79 | 0.99 | 1.32 | 1.65 |
Tray | 1.17 | 1.48 | 1.78 | 2.23 | 2.97 | 3.71 | |
75*50 | Lid | 0.69 | 0.87 | 1.04 | 1.3 | 1.73 | 2.16 |
Tray | 1.35 | 1.69 | 2.03 | 2.54 | 3.38 | 4.23 | |
100*50 | Lid | 0.86 | 1.07 | 1.29 | 1.61 | 2.14 | 2.68 |
Tray | 1.52 | 1.9 | 2.28 | 2.84 | 3.79 | 4.74 | |
150*50 | Lid | 1.19 | 1.48 | 1.78 | 2.23 | 2.97 | 3.71 |
Tray | 1.85 | 2.31 | 2.77 | 3.46 | 4.62 | 5.77 | |
200*50 | Lid | 1.52 | 1.9 | 2.27 | 2.84 | 3.79 | 4.74 |
Tray | 2.18 | 2.72 | 3.26 | 4.08 | 5.44 | 6.8 | |
250*50 | Lid | 1.85 | 2.31 | 2.77 | 3.46 | 4.62 | 5.77 |
Tray | 2.5 | 3.13 | 3.76 | 4.7 | 6.26 | 7.83 | |
300*50 | Lid | 2.18 | 2.72 | 3.26 | 4.08 | 5.44 | 6.8 |
Tray | 2.84 | 3.54 | 4.25 | 5.32 | 7.09 | 8.86 | |
350*50 | Lid | 2.51 | 3.13 | 3.76 | 4.7 | 6.26 | 7.83 |
Tray | 1.98 | 3.96 | 4.75 | 5.93 | 7.91 | 9.89 | |
400*50 | Lid | 3.54 | 4.25 | 5.32 | 7.09 | 8.86 | |
Tray | 4.37 | 5.24 | 6.55 | 8.74 | 10.92 | ||
450*50 | Lid | 3.96 | 4.75 | 5.93 | 7.91 | 9.89 | |
Trya | 4.78 | 5.74 | 7.17 | 9.56 | 11.95 | ||
500*50 | Lid | 4.37 | 5.24 | 6.55 | 8.73 | 10.92 | |
Tray | 5.19 | 6.23 | 7.79 | 10.39 | 12.98 | ||
550*50 | Lid | 4.78 | 5.73 | 7.17 | 9.56 | 11.95 | |
Tray | 5.61 | 6.73 | 8.41 | 11.21 | 14.01 | ||
600*50 | Lid | 5.19 | 6.23 | 7.79 | 10.39 | 12.98 | |
Tray | 6.02 | 7.22 | 9.03 | 12.03 | 15.04 | ||
650*50 | Lid | 5.6 | 6.73 | 8.41 | 11.21 | 14.01 | |
Tray | 6.43 | 7.71 | 9.64 | 12.86 | 16.07 | ||
700*50 | Lid | 6.02 | 7.22 | 9.03 | 12.03 | 15.04 | |
Trya | 6.84 | 8.21 | 10.26 | 13.68 | 17.1 | ||
750*50 | Lid | 6.43 | 7.71 | 9.64 | 12.86 | 16.07 | |
Trya | 7.25 | 8.7 | 10.88 | 14.51 | 18.13 | ||
800*50 | Lid | 6.84 | 8.21 | 10.26 | 13.68 | 17.1 | |
Tray | 7.67 | 9.2 | 11.5 | 15.33 | 19.17 | ||
850*50 | Lid | 7.25 | 8.7 | 10.88 | 14.51 | 18.13 | |
Tray | 8.08 | 9.69 | 12.12 | 16.16 | 20.2 | ||
900*50 | Lid | 7.67 | 9.2 | 11.5 | 15.33 | 19.16 | |
Tray | 8.5 | 10.19 | 12.74 | 16.98 | 21.23 |
Finishes&materials: HDG, Pre-galvanized, Electronic-galvabized, Powder-coating, stainless steel 304/316, GI
Lenghth: Maximum 3000mm perforated cable tray
Real perforated cable tray display
Production line
Loading site
HDMANN INDUSTRY CO., LTD---CABLE SUPPORT&FRAMNG SYSTEM
CHINA LEADING OEM SUPPLIER IN THE LINE OF CABLE SUPPORT
CERTIFICATION
What is the type of our bussines?
We are a exporter and manufacturer, and have factories in China.
What are the trading terms we practice?
Generally, we practice FOB/CIF/C&F and DAP.
What are the payment terms we accept?
T/T, L/C, NEGOTIABLE
What is the delivery time?
Generally, it would take 10-20 days to finish the production for normal order quantity.
Can we provide the samples?
Yes, sample is free.